Day 26 – 2014

Day 26 – 2014

Well now, things could start to get boring here. I have started trimming the slate into usable bits. Not as much done last night as I would have liked as the person who borrowed my tile cutter left it in a hell of a state. It is now fixed and is working...
Day 23 – 2014

Day 23 – 2014

Spent the day sorting out the slates that had been taken down from the roof. End result? Out of the 1000+ slates that came off only 195 were full size and possible reusable.  Those are the front row and back row in the right hand pallet.  All the slates in the right...
Day 22 – 2014

Day 22 – 2014

Preparation time! With the advent of the problems on my roof (storm damage before Christmas with more following the winds in February) the entire roof was stripped.  The idea was for it to be re-felted, re-battened and then reusing the slate that had been taken off to...